equipment. For example, Indonesia has the SNI certification, Thailand has the TISI certification, and the Philippines has the BPS certification. It is necessary to confirm in advance the equipment voltage (such as 380V/50Hz in Thailand), the compatibility of the CE certification, and the proof of environmentally friendly materials.清關包含三大核心階段:前期準備階段(15-30個工作日)、海關申報階段(3-7個工作日)、查驗放行階段(1-5個工作日)。其中舊設備進口需額外增加裝運前檢驗環節,根據2025年海關總署第58號公告,涉及精密儀器的進口需提前完成電磁兼容性備案。
根據最新《進口機電產品管理辦法》,2025年起實施兩項重大調整:一是ATA單證冊適用范圍擴展至價值500萬以下的臨時進口設備;二是查驗重點轉向安全防護裝置核查,特別是涉及AI技術的自動化設備需提供算法安全說明。建議提前三個月與代理公司建立新政應對小組。
? 2025. All Rights Reserved. Shanghai ICP No. 2023007705-2 PSB Record: Shanghai No.31011502009912